A worked example
From job notes to a proposal your team can review.
The site visit is over. Your estimator needs a scope they can price. Here’s how a voice note could give them a first draft while the details are still fresh.
Fictional site visit
What the estimator would actually see
- The field note
- “Oak Street loading dock. Two wall panels are cracked. Replace both. They want us in before opening. I forgot to measure the panels.”
- The draft scope
- Replace two damaged wall panels at the Oak Street loading dock. The customer requests work before opening. Panel dimensions and the exact access time still need confirmation.
- Still for the estimator
- Get the measurements, confirm when the crew can get in, then price the job. The draft stays in the office until the estimator approves it.
How it would fit into the workday
The crew keeps recording notes the way it does now. We connect those notes to your estimating template and approved service descriptions. The estimator gets an editable draft, the original note and a short list of open questions in one place.
We’d try it on a few past jobs first. We’d time the work through final review and check what the drafts missed. If corrections eat up the time saved, we adjust the workflow before rolling it out. After launch, your team has someone to call when a template changes or a draft comes out wrong.